Informações do projeto

Referência da Obra

Legacy Parkway

Local

Farmington, UT/Salt Lake City, UT, US

Cliente

ACF West, Inc/ Aims Contracting and Clyde Contracting

Período da Obra

December 2006 - Fall 2008

Galeria

 |
 |
 |
 |

Detalhes do Projeto

Tarefa

In December of 2006, construction on a segment of the Legacy Parkway in the state of Utah began. The project was designed by the Utah Department of Transportation to reinforce soft soils underneath bridge approach embankments.

Solução

Construction was completed in three stages. Stage 1 and 2 was awarded to Aims Contracting, while stage 3 was awarded to Clyde Contracting. Stabilenka® 730.130, manufactured by HUESKER Synthetics was supplied to the two contractors by ACF West, Inc. Legacy Parkway connects Farmington, UT with Salt Lake City, UT and was completed in the fall of 2008.

Benefícios

313,000 yd2 of Stabilenka 730.130 High Strength Geotextile was delivered over four months directly from HUESKER’s manufacturing facility to the job site and was installed by Aims and Clyde Contractors prior to project completion in 2008.


Also interesting

Überblick vom Flughafen Perth in Australien

Estradas e Pavimentos

Perth | AU

Leia mais »

Obras de Terra e Fundações

Г.Москва | RU

Leia mais »

Estradas e Pavimentos

Mönchengladbach | DE

Leia mais »